Choose by assembly

Start with the part of the building you are changing.

Each project guide begins with existing conditions and stop points, then compares practical insulation paths.

13 practical guides
01 / Small air-sealing projects7 min

Air Sealing Windows, Doors, and Small Gaps: Where Foam Fits

Distinguish window-frame air leaks, moving joints, drainage openings, and service penetrations before choosing foam, caulk, or weatherstripping.

Read the guide
02 / Garage boundary guide8 min

Attached Garage Insulation: Air, Fumes, Fire Separation, and Foam

Plan attached-garage insulation around the house boundary, vehicle fumes, pressure, fire separation, rooms above, and local code requirements.

Read the guide
03 / Foundation wall guide8 min

Basement Wall Insulation: Diagnose Water Before Adding Foam

Choose a basement wall insulation path after assessing drainage, masonry moisture, foundation condition, drying, framing, fire covering, and radon.

Read the guide
04 / Planning an insulation retrofit9 min

Before Removing Existing Insulation: What to Keep and Check

Decide whether existing insulation can stay, what needs assessment before disturbance, and how to compare removal, repair, access, cleanup, and replacement scopes.

Read the guide
05 / Sloped ceiling project guide9 min

Cathedral Ceiling Insulation: Vented, Unvented, or Above the Roof Deck?

Compare insulation options for an existing cathedral ceiling by cavity depth, roof ventilation, moisture, access, reroof timing, and inspection evidence.

Read the guide
06 / Crawlspace assembly guide8 min

Crawlspace Spray Foam: Water, Ground Vapor, Radon, and Termites First

Plan crawlspace insulation only after drainage, ground vapor, radon, termite inspection, combustion equipment, and venting strategy are resolved.

Read the guide
07 / A better written scope9 min

How to Compare Spray Foam Contractor Quotes Before You Sign

Compare spray foam proposals by assembly boundary, preparation, thickness, exposure controls, fire covering, inspection records, and exclusions.

Read the guide
08 / Verification and project records8 min

Insulation Inspection and Handover: What Owners Should Receive

Plan insulation checks before concealment, distinguish owner records from qualified inspections, and organize product, thickness, covering, and correction records.

Read the guide
09 / Finished attics and bonus rooms9 min

Knee Wall Insulation: Fix the Boundary Around a Bonus Room

Plan knee wall insulation around side attics, open floor-joist bays, access doors, roof slopes, eave ventilation, and the causes of an uncomfortable bonus room.

Read the guide
10 / Rim and band joists8 min

Rim Joist Insulation: An Assembly-First Spray Foam Guide

Plan rim-joist air sealing and insulation around moisture, masonry, framing, combustion clearances, termite inspection, and fire covering.

Read the guide
11 / Attic assembly guide10 min

Spray Foam for Attics: Floor or Roof Deck First?

Decide between a vented attic floor and an unvented roofline before choosing foam, thickness, ventilation, or a contractor.

Read the guide
12 / Wall assembly guide9 min

Spray Foam in Exterior Walls: Open Cavities vs Retrofit Injection

Plan wall insulation around rain control, sheathing, vapor profile, thermal bridging, wiring, fire blocking, and whether the cavity is open or concealed.

Read the guide
13 / Interior wall guide11 min

Spray Foam in Interior Walls: Sound, Privacy, and Cavity Access

Decide whether an interior wall needs insulation, compare sound-control assemblies, and plan around access, utilities, fire protection, and future repairs.

Read the guide

A useful next step

Turn the reading into a plan.

Answer seven practical questions and see which conditions to investigate before choosing a material.

Plan my project