The project workbench · 03

Compare contractor bids

Price only makes sense after the scopes match. Mark each item included, excluded, unclear, or not applicable for up to three bids.

0 of 48 scope decisions recorded

Start anywhere. Blank and unclear fields become follow-up questions.

01

Define the work

Make each bid describe the same project.

Scope decisionBid ABid BBid C
The proposal identifies the project area and the air and thermal boundaries.
The contractor documents water, structure, pest, radon, and combustion concerns that need assessment.
The scope identifies surfaces to spray, areas to protect, and inspection access to leave open.
Required permits, inspections, qualifications, insurance, and responsible parties are identified.
02

Ask for the evidence

Put the exact material and its requirements in writing.

Scope decisionBid ABid BBid C
The exact product and formulation are named, with current label, safety data sheet, and technical documents.
The scope specifies intended thickness and the product’s substrate, temperature, lift, and cure requirements.
The proposed fire covering or exposed use is supported for this exact product and assembly.
The contractor explains how the assembly handles air leakage, moisture, drying, and transitions.
03

Plan the work zone

Know what will happen before anyone starts spraying.

Scope decisionBid ABid BBid C
The contractor provides product-specific arrangements for occupants, pets, restricted access, and re-occupancy.
The written plan identifies isolation, ventilation, HVAC protection, and worker protective equipment.
Adjacent rooms, exhaust locations, and communication with affected occupants are addressed.
A responsible contact and the shutdown, emergency, cleanup, and waste procedures are identified.
04

Agree on the handoff

Decide what a complete, documented job looks like.

Scope decisionBid ABid BBid C
The installer will record substrate condition and required moisture and temperature checks before application.
The handoff includes product and lot records, installation conditions, thickness checks, and useful photos.
The contract assigns responsibility for corrections, fire covering, final inspections, and permit completion.
Payment milestones, warranty terms, exclusions, and the process for reporting a concern are written down.
Choose the project for this record

Saving to an existing project replaces only this tool’s record. A new project keeps earlier projects separate. Avoid addresses and private details.

Save to Project Binder before changing languages. Only saved records reopen; changing languages does not save your edits.