Map the layers, drainage and open cavities before selecting any foam.
Repair bulk-water paths and flashing defects before insulating. Foam should not conceal an active leak or replace exterior drainage.
Trace water, air, vapor, and thermal control across the whole wall. Show how each layer continues at windows, floors, and the roof.
Locate wiring, plumbing, boxes, penetrations, and future access. Decide what must remain visible, serviceable, or protected.
Compare the exact product documents with the substrate, lift limits, temperature range, target thickness, and intended control-layer role.
Confirm required thermal or ignition protection, local amendments, inspection sequence, and any areas that cannot be concealed yet.
Keep product identity, lot, temperatures, substrate condition, area, thickness checks, photos, and any corrected defects.
Proceed only when water control, continuity, services, product instructions, protection, and inspection all agree.
Ask a question →